BACK FILLING FOR STRUCTURAL EXCAVATION

BACK FILLING FOR STRUCTURAL EXCAVATION GENERAL                               Normally structural  back filling allowed minimum 3 days after removed form work and curing Back fill placed  around the structure shall be same elevation and same t…

EARTHWORK EXCAVATION FOR BUILDINGS

EARTHWORK EXCAVATION FOR BUILDINGS SCOPE                   This section consists of specifications pertaining to all clearing, excavation and back filling necessary to carry out the specified building works. REFERENCE   …